A catalogue of changes...
We have been in 202 for a little over two months now. Bit by bit it is becoming more and more "ours". Actually, it's been a whole bunch of bits over a relatively short period of time.
Here are just a few of the changes....
- New house number
- New front screen door handle (used to be brown)
- New door handle and locks (was brass, now is brushed nickel)
- New door bell
- Front steps painted
- New front entrance light
- Door removed from closet and outer frame painted white (was turquoise)
- Stairs to second floor sanded and stained/refinished
- New stair rungs (white) and handrail sanded/stained/refinished
- Medicine cabinet painted white and replaced old cabinet
- New bathroom light fixture, toilet paper holder, and towel rack
- New toilet
- Cover for shower curtain rail
- New bathroom cabinet
- Door frames on second level and linen closet door painted white
- New ceiling fans in upstairs bedrooms
- Basement stairs painted white and carpet added
- Front room in basement carpeted and painted
- New transition added between front room and bar room
- New shelf built in bar area
- Move fridge to other side
- Floors scrubbed/wax removed
- New double sink and taps
- Shelf added to area where fridge was
- Edge of walls filled
- Cupboards lined
- Cupboards moved to back room
- Island and cart moved to kitchen
- Back room floors scrubbed
- Backroom curtains removed
- Dining room floors sanded and varnished
- Dining room corner cabinet sanded, stained and moved
- Dining room curtains changed, curtain rod, and plant added
- Back of house trim caulked and painted white (was red)
- New rain gutter to back of house
- Outdoor lights added to deck area
- Patio stones moved to under deck
Wow, so many changes in such a short period of time. And I'm sure I haven't accounted for everything.

Comments
Post a Comment